Skip to main content Skip to search Skip to main navigation
As we transition towards shipping orders from the UK very soon, a small number of products will already be available in our UK warehouse with same-day dispatch, with stock visible on product level.

How long does the heat pump take to heat my pool?

That depends on the size of the pool and the ambient temperature of the air outside. An initial heating period usually takes 3 to 4 days. After that, the heat pump only needs to work a few hours per day to keep the water at the right temperature.